Thursday, April 10, 2014



This is the last thing we need to add to the project. It's pie. and then we just need to add sound and whatever else we need to do before it is due. We will be on time with the project.

Tuesday, April 8, 2014

This week we possibly could get done with the entire thing. if we come in we definitly will get done because the annimation part is almost done, and then the ending page is almost done too because Billy is working on that and the only thing we would have left is the sounds.

Friday, April 4, 2014





This week we got most of the animation done itself and should be done on schedual.

Wednesday, April 2, 2014


These are examples of things our trap can catch which is the bottom picture. The top picture is an example of how well it works and that it can be placed even just on one side of the house and that path leading up to the trap is a path made by animals and the dots are footprints leading up to the trap but none come back down.

Monday, March 31, 2014

We are ready to start animating and that shouldn't take too. We have the animation for the trap all done and we are also working on the final page that we will add on too the end of the animation.

Thursday, March 27, 2014

We are practically done and are almost ready to animate. that shouldn't take that long because the trap itself is already rigged and ready for trapping and all we have to do is animate things to be trapped by the trap (aka Billy).

By the end of this week we will start animating the trap and the characters that we will be showing in our commercial.

Friday, March 21, 2014

We are almost done and we will have the story board for sure next class and we are trying to make it over kill but it will still be very low price because we can and we want to do that.

Monday, March 17, 2014

Weekly Goal: Too get the color and texture to the item we are selling.

Thursday, March 6, 2014

This week we got done with almost all of the actual product itself and we might almost be ready to move on once done with it which will not take that long.

Tuesday, March 4, 2014

Our goal this week is to get the Main Project done with and start working on what needs to go in it and what not.

Friday, February 28, 2014

We got the idea done and the "rough copy" of the trap done but we will touch it up and add to it and make it look a lot better.
Devon: I made the trap and am going to do most of the designing stuff.
Billy: I made the drawing and coming up with the ideas for the trap and what is going to be on the inside.

Monday, February 24, 2014

First Weekly Goal

To get the hardest things out of the way, the beginning and the ideas of the project. We will both contribute to the project in anyway we need it. For example if we need sound in one part of the project we then we can send the one that is better with sound to do that.